Leanabl conducted KGMP mock audits at 12 foreign manufacturer sites in 2024:

Site Profile Count
US-based (FDA QSR + ISO 13485) 5
EU-based (ISO 13485 + MDSAP) 4
Japan-based (PMDA + ISO 13485) 2
China-based (NMPA + ISO 13485) 1

Total findings across audits: 247. Top 10 recurring issues accounted for 192 findings (78%).

The Top 10 Findings

#1. Korean SOP Coverage Insufficient — 11/12 sites

Korean translations of inspection-critical SOPs missing or incomplete.

Typical gap: 8–15 SOPs in English only; KGMP requires 15–25 Korean SOPs.

Remediation: $15K–$25K translation cost, 4–6 weeks.

#2. Design History File Korean Summary Missing — 10/12 sites

DHF complete in English but lacking Korean executive summary required for inspection trace.

Typical gap: No Korean-language design output summary or design review minutes.

Remediation: $5K–$12K, 2–3 weeks.

#3. Change Control Records Not Tagged to KMD Numbers — 9/12 sites

Change records reference internal product codes without MFDS license cross-reference.

Typical gap: Inspectors cannot trace internal changes to Korean-marketed products.

Remediation: $3K–$8K (process update), 2 weeks.

#4. Open CAPAs Older Than 90 Days — 9/12 sites

Stale CAPAs signal ineffective corrective action to inspectors.

Typical gap: 5–15 open CAPAs older than 90 days at audit start.

Remediation: Close or restart all old CAPAs, 4–6 weeks.

#5. Supplier Quality Records Not Korean-Documented — 8/12 sites

Critical supplier audits and quality agreements in English only.

Typical gap: No Korean trail showing supplier accountability for Korean-marketed products.

Remediation: $4K–$10K, 2–3 weeks.

#6. Complaint Handling Without Korean Timeline Tracking — 8/12 sites

Generic complaint workflow does not flag Korean adverse event timelines (5/15/30 days).

Typical gap: Late adverse event reporting risk for Korean events.

Remediation: $3K–$6K (process update), 1–2 weeks.

#7. Management Review Missing Korean Section — 8/12 sites

Quarterly or annual management review without dedicated Korean market review.

Typical gap: Korean market performance, KLH effectiveness, Korean regulatory changes not reviewed at executive level.

Remediation: Update management review template, 1 week per cycle.

#8. KLH Interface Procedure Undocumented — 7/12 sites

Manufacturer-KLH interactions informal, not documented procedure.

Typical gap: Roles, decision authority, communication frequency not defined.

Remediation: $5K–$10K (procedure development), 2 weeks.

#9. Calibration Records Not Current — 7/12 sites

Equipment calibration overdue or records incomplete.

Typical gap: 3–10 instruments with overdue calibration at audit start.

Remediation: Calibration schedule update, $2K–$5K (per instrument), 1–2 weeks.

#10. Training Records Missing for Korean Documents — 6/12 sites

Staff training records do not cover Korean SOPs.

Typical gap: No training trail for Korean-language documentation users.

Remediation: $3K–$8K, 2 weeks.

Remediation Outcomes

Phase Duration Cost
Mock audit 2–3 days $15K–$25K
Remediation planning 1 week Included
Critical findings closure 4–6 weeks $30K–$80K
Verification mock audit 1–2 days $5K–$10K
Total 6–10 weeks $50K–$115K

MFDS Inspection Results Post-Remediation

All 12 sites passed MFDS KGMP inspection on first attempt:

Outcome Count
Passed with zero major findings 9/12
Passed with 1–2 minor findings 3/12
Failed (required re-inspection) 0/12

Compared to industry baseline for foreign sites without preparation:

  • First-attempt pass rate without preparation: ~50%
  • First-attempt pass rate with structured mock audit + remediation: 100% in this cohort

Cost-Benefit Analysis

Without mock audit:

  • 50% probability of failure
  • Failure cost: $30K–$80K (re-inspection + remediation + delay)
  • Expected cost: $15K–$40K (50% × failure cost)

With mock audit + remediation:

  • Mock audit + remediation: $50K–$115K
  • ~95% probability of first-attempt pass
  • Expected total cost: $52K–$120K

The cost difference is small ($12K–$80K), but the time-to-market benefit is 4–6 months. For products generating $500K+ Korean revenue, mock audit ROI is significant.

Patterns by Site Origin

Origin Most Common Finding
US (FDA QSR) #2 DHF Korean summary missing
EU (ISO 13485 + MDSAP) #1 Korean SOPs insufficient
Japan #6 Complaint handling Korean timeline
China #7 Management review Korean section

US and EU manufacturers tend to over-document in English; Asian manufacturers tend to under-document Korean-specific items.

Frequently Asked Questions

Q: How long is a typical mock audit?

A: 2–3 days on-site for the audit + 1–2 days for findings documentation. Leanabl typically provides full report within 1 week of audit close.

Q: Can we use internal staff for mock audit?

A: Yes, if internal team has KGMP expertise (rare for foreign manufacturers). Most clients use external mock audit to get inspector-realistic perspective.

Q: What happens if mock audit finds critical issues?

A: Critical issues drive remediation timeline. For severe issues, KGMP application is delayed until remediation complete (typically 6–10 weeks).

Q: Does Leanabl guarantee inspection pass?

A: No guarantee, but track record speaks: 100% first-attempt pass rate among clients completing full mock audit + remediation program.

Q: When should we schedule mock audit?

A: 8–12 weeks before scheduled MFDS inspection. Allows time for remediation and verification.

How Leanabl Helps

Contact Leanabl for mock audit scoping.


Last updated: 2026-05-15.

有监管方面的问题?

与韩国监管专家直接讨论您的产品、时间线或下一次提交。

与专家交谈